Concrete estimating tools

Footing Calculator

Calculate concrete for strip footings, isolated pads or both. See cubic yards, bag counts and ready-mix orders instantly.

Strip & trench footingsIsolated concrete padsReady-mix & bags

Interactive concrete takeoff

How much footing concrete do you need?

Enter dimensions. Results update as you type.

1

Select the footing type

Try an example:
2

Enter footing dimensions

Continuous strip footing
Add runs without counting intersecting concrete twice.
Not the footing's burial or excavation depth.
3

Set the ordering options

QUIKRETE Concrete Mix 1101 example yields; check your label.
Advanced: custom yield, ready-mix rounding & prices
Use the finished volume on your actual product label.
0 means no extra supplier rounding; confirm local minimum orders.
Editable planning assumption; not a vehicle or lifting rating.
Ready-mix order, rounded up
3.75yd³

Includes 10% allowance and 0.25 yd³ supplier increment.

Whole bags to purchase163 bags80-lb mix · 0.60 ft³/bag
Concrete before allowance3.29 yd³
Volume with allowance3.62 yd³
Adjusted volume in ft³97.78 ft³
Footing dimensions at a glanceDiagrammatic • not to scale
Strip footing cross-section and dimensionsIllustrative footing shape; labels change with dimensions and selected footing type. 80 ft net run 16 in width 10 in concrete Continuous strip footing
The footing cross-section uses the full concrete width and thickness. Burial depth, soil suitability, and reinforcement are separate design decisions.

Quantity breakdown

Strip-footing concrete3.29 yd³
Isolated-pad concrete0.00 yd³
Approx. wet concrete weight14,667 lb
Bagged vs. ready-mix163 bags / 3.75 yd³

Compare concrete bag sizes

Bag sizeExample yieldBags
40 lb0.30 ft³326
50 lb0.375 ft³261
60 lb0.45 ft³218
80 lb0.60 ft³163

Example yields are for QUIKRETE Concrete Mix No. 1101. Bag quantities use the allowance-adjusted volume before supplier increment rounding.

Bagged material totalAdd a bag price
Ready-mix material + deliveryAdd a ready-mix quote

This is a material takeoff, not a footing sizing or bearing-capacity design. Confirm finished dimensions, footing details, supplier requirements, and inspection hold points before ordering.

Footing concrete = length × width × concrete thickness. For a strip footing, multiply the non-overlapping total length by the width and thickness; for pads, multiply one pad’s volume by the number of pads. Add your chosen allowance, then round up to the supplier's ordering increment or whole bag yield. Do not use trench depth or frost depth in place of concrete thickness.

On this page: formulas, measurements, examples and FAQs
  1. Footing volume formulas
  2. How to measure your footings
  3. Worked examples: strips, pads and combined pours
  4. Strip versus pad versus round footing
  5. Footing quantity reference chart
  6. Avoid double-counting at intersections
  7. Turn the estimate into an order
  8. Depth, frost protection and design limits
  9. Pre-pour checklist
  10. Frequently asked questions
  11. Sources

Footing calculator formulas

Every rectangular footing is a prism. Convert all dimensions to the same unit, multiply, and convert to cubic yards or cubic meters. Count the actual concrete volume rather than the dimensions of the excavation around it.

US and metric footing volume formulas
TypeUS formula (yd³)Metric formula (m³)
Continuous stripRun length (ft) × width (in) × concrete thickness (in) ÷ 3,888Length (m) × width (mm) × thickness (mm) ÷ 1,000,000
Isolated padsCount × pad length (in) × width (in) × thickness (in) ÷ 46,656Count × length (mm) × width (mm) × thickness (mm) ÷ 1,000,000,000
Combined volumeStrip volume + separate pad volumeStrip volume + separate pad volume
AllowanceNet volume × (1 + allowance % ÷ 100)
Whole bagsRound up [adjusted cubic feet ÷ product yield in ft³/bag] (or consistent metric units)

There are 27 cubic feet in one cubic yard and 46,656 cubic inches in one cubic yard. For a round pier or Sonotube, use the separate Sonotube Calculator, which uses πr² × height instead of rectangular footing geometry.

How to measure a strip footing or pad

Continuous strip footing

Measure the concrete run along the foundation or wall line, using a non-overlapping net run. Width is measured across the bottom of the concrete footing; thickness is the vertical dimension of concrete being placed. For trenches wider than the planned forms, remeasure the actual concrete-filled shape before ordering.

Strip footing below a wall, with concrete thickness distinct from below-grade depthConcrete footing widthThicknessFinished groundWall
Illustrative cross-section, not a foundation design.

Isolated spread pad

For a separate square or rectangular pad, use its full concrete length × concrete width × concrete thickness and multiply by the number of identical pads. A pier or pedestal above the pad is an additional concrete component, but do not count its overlapping volume twice.

Concrete spread pad with independent dimensions and a pier abovePad lengthPad width →Pier / pedestal: separate volume
Include a pedestal only where it adds concrete beyond the pad.

Footing concrete thickness is not the same thing as embedment depth, trench depth, or frost-line depth. This calculator determines material quantity only; it does not decide a safe footing size.

Worked footing examples with bags and ready-mix

Example A · Strip footing

80 ft × 16 in × 10 in

88.89 ft³ net = 3.29 yd³. With 10% extra, 3.62 yd³; at 0.25-yd³ supplier increments, order 3.75 yd³. At 0.60 ft³ per 80-lb bag, buy 163 bags before considering site-specific issues.

Example B · Separate pads

Four pads · 24 × 24 × 12 in

Four 2 × 2 × 1-ft pads use 16 ft³ = 0.59 yd³ net. With 10% extra: 0.65 yd³. At quarter-yard increments: 0.75 yd³, or 30 bags at a 0.60-ft³ yield.

Example C · Combined pour

Strip plus four separate pads

88.89 + 16 = 104.89 ft³ net. At 10% allowance: 115.38 ft³ = 4.27 yd³. Rounded to quarter-yard increments: 4.50 yd³; or 193 bags at a 0.60-ft³ yield.

These are geometric illustrations, not recommended footing dimensions. The combined calculation assumes that none of the separate pads overlaps the strip concrete. If they intersect, deduct that shared space before totaling.

Which footing type should you calculate?

01

Strip / continuous footing

A continuous rectangular concrete strip under a wall or foundation line. Use the total net length and the specified width and thickness.

02

Isolated / spread pad footing

A square or rectangular foundation pad for a separate column or pier. Enter one pad’s concrete dimensions and count of matching pads.

03

Round pier or tube

A cylindrical concrete footing or Sonotube uses πr²h. Use the round-form calculator instead of forcing a circle into this rectangular model.

Concrete footing volume reference chart

Quick quantities for a 10-foot-long rectangular strip, before allowances or supplier rounding. Bag counts use a 0.60-ft³ example product yield and are rounded up to whole bags.

Volume and 80-lb example bag quantities for 10-ft strips
Width × concrete thicknessNet ft³Net yd³80-lb example bags
12 × 8 in6.670.2512
12 × 12 in10.000.3717
16 × 8 in8.890.3315
16 × 12 in13.330.4923
24 × 8 in13.330.4923
24 × 12 in20.000.7434

These values are unit-conversion examples. Use the approved footing geometry and the exact yield printed on your concrete bag, rather than treating an example row as a design recommendation. Compare bag sizes here.

How to avoid double-counting footing intersections

If two perpendicular strips cross, adding two full rectangular volumes includes their shared rectangle twice. For equal footing widths and thicknesses, subtract the overlap once. The safest practical method is to break the footprint into non-overlapping strips, for example measuring one continuous leg fully and starting the adjoining leg at its face.

For L-shaped and T-shaped intersections, confirm the actual geometry and measure the joined space only once. Different widths, levels, step elevations, and pads that overlap strips require separate takeoffs or a dimensioned drawing; the calculator does not automatically find those overlaps.

Plan view of intersecting footings showing overlap counted onceShared squareCount onceRun ABTop view · schematic
The highlighted overlap is included in both gross rectangles. Subtract it once or measure net runs.

From takeoff to concrete order

  1. Use the final forms or excavated shape

    Check the actual length, width, and concrete thickness at multiple points, especially where trenches widen or bottoms vary.

  2. Separate non-overlapping components

    List each strip, pad, pier, pedestal, and step once. Group truly identical parts before applying the allowance.

  3. Add an explicit allowance

    Over-excavation, spread forms, handling loss, and uneven ground can change required quantities. If a substantial deeper region is known, measure it instead of hiding it in a blanket percentage.

  4. Compare bagged concrete with ready-mix

    Use the labeled finished yield for packaged mix; evaluate handling and placement capacity as well as price. Ask the supplier about minimum loads, quarter-yard increments, delivery fees and placement access.

  5. Verify design, inspections and pour sequence

    Have footing size, concrete specification, reinforcement, foundation inspection, truck access and placement timing resolved before scheduling the pour.

NRMCA explains why ordered ready-mix volumes can differ from the constructed geometry and recommends making the concrete producer aware of project performance and placement requirements. See CIP 8 and CIP 31.

Footing thickness, embedment and frost protection are different

This estimator does not choose footing width, thickness, burial depth, reinforcement or soil-bearing capacity. The 2024 International Residential Code describes footing requirements based on loading, soils, construction and climate; local adoption and amendments control the applicable rules. Its general provisions address support on suitable soil and frost protection, and they are not universal dimensions to copy.

For example, a footing may be placed below grade while the concrete itself is only part of the excavation depth. Some projects need an engineered footing, a step, a pedestal or a foundation wall. Separate the material volume from decisions about foundation design, moisture, drainage and code inspection. Consult the approved drawings and local building department when dimensions are uncertain.

2024 IRC, Chapter 4: Foundations provides code context, not a substitute for project-specific requirements.

Footing pre-pour checklist

Mark off the preparation items as you confirm them. Your choices are stored only in this browser when storage is available.

Before ordering concrete

0 of 7 complete

Frequently asked questions about footing concrete

How do I calculate concrete for strip footings?

Multiply the total non-overlapping strip length by its concrete width and thickness, with all measurements converted to the same unit. Divide cubic feet by 27 to get cubic yards, then apply an allowance and your supplier’s ordering increment.

How many concrete bags are needed for a footing?

Divide the volume including allowance (in cubic feet) by the actual finished yield per bag and round up. For a 0.60-ft³ example 80-lb bag, a footing requiring 12 ft³ takes 20 whole bags before any additional allowance or supplier restrictions.

How do I calculate concrete for multiple footing pads?

Find the volume of one pad (length × width × concrete thickness), multiply by the number of identical pads, and then add your selected allowance. Different-sized pads must be calculated separately or grouped by size.

Can I combine continuous footings and individual pads in one order?

Yes. Select “Strip footing + separate pads” and enter the geometry of each. The calculator adds their volumes and applies one allowance. This assumes the pad concrete does not occupy a space already counted in the strip footing.

Is footing depth the distance below ground?

Not in this calculator. “Concrete thickness” is the actual vertical height of concrete being placed, whereas depth below grade is a separate design and frost-protection measurement.

Does the calculator choose footing dimensions or reinforcement?

No. Footing width, concrete thickness, bearing soil, frost protection, reinforcement and allowable loads must come from the applicable plans, design and local requirements. This tool estimates material for dimensions already determined.

Why is my ready-mix order bigger than the net footing volume?

The net volume is the exact geometric estimate. The tool adds your selected extra allowance, then rounds the ready-mix amount upward to the supplier increment. A separate bag estimate rounds by package yield and does not inherit the truck-order increment.

Can I use this calculator for round deck footings?

Use the Sonotube Calculator for cylindrical piers or the Deck Footing Calculator for a pier and separate base pad. Those shapes are not rectangular prisms.

How much extra concrete should I allow?

There is no universal percentage. The appropriate allowance depends on the accuracy of your dimensions, formwork, irregular trenches and handling loss. The default 10% is an editable estimating illustration, not a specification.

Technical sources and references

These references support the concrete quantity formulas, bag examples and project-planning cautions. Always use the current manufacturer instructions and governing project documents.

Scroll to Top